Turners Falls Power Canal Construction
dc.contributor | Ed Gregory archive | |
dc.contributor | FirstLight Power Resources | |
dc.date.accessioned | 2022-05-21T15:00:14Z | |
dc.date.available | 2022-05-21T15:00:14Z | |
dc.description | >>>The date of the item is in the File Name, i.e., 1eg66tfccon.jpg<<< -- >>>the number in the name (66) is the year of the image . . . 1866. >>>Other dates 1869, 1902, 04, 10, 12, 14, 15 16. | |
dc.description | The Turners Falls Power Canal construction begins in 1866. Three separate construction segments has its 3.5 mile length completed in 1916. | |
dc.description.abstract | A Gallery of 40 Items - Begin . . . 1866 | |
dc.identifier.uri | https://dspace.montaguearchive.org/handle/MHS-01376/6644 | |
dc.language.iso | en | |
dc.title | Turners Falls Power Canal Construction | |
dc.type | Image | |
dspace.entity.type | ||
dspace.iiif.enabled | true |
Files
Original bundle
1 - 5 of 40
Loading...
- Name:
- 1eg66tfccon.jpg
- Size:
- 456.13 KB
- Format:
- Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
- Description:
- Canal headgate construction. We're lookin' west from the Connecticut River's bed. A coffer dam diverts the river flow over the crib dam (out of frame). The gate house will be built atop the headgates.
Loading...
- Name:
- 2eg66tfccon.jpg
- Size:
- 647.05 KB
- Format:
- Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
- Description:
- Canal headgate construction . . . a closer look.
Loading...
- Name:
- 3eg02tfccon.jpg
- Size:
- 434.42 KB
- Format:
- Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
- Description:
- Lookin' west at the rock removal along the south bank of the Turners Falls Power Canal. The work is being done on the downstream side of the headgates.
Loading...
- Name:
- 4eg04tfccon.jpg
- Size:
- 394.1 KB
- Format:
- Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
- Description:
- More rock and ledge excavation on the downstream side of the headgates. This view looks east at a time when the canal is being widened and lengthened (1904). >>> Buildings in the rear; on the left, International Paper Co.. Center, Clark & Chapman Machine Co. (1872-1908) & later the Shawmut Mfg. Co. (1877-1891) maufactured faux leather goods. This building will be removed to accommodtae the headgate gatehouse.
Loading...
- Name:
- 5eg05tfccon.jpg
- Size:
- 448.89 KB
- Format:
- Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
- Description:
- Ledge removal along the south bank of the canal just below the gatehouse. Buildings of the Clark & Chapman Machine Co. in the rear.
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.68 KB
- Format:
- Item-specific license agreed upon to submission
- Description: