Northfield Mt. Hydro-Electric Facility - FirstLight Power Resources

dc.contributorJohn Crowley collection
dc.date.accessioned2022-05-05T18:06:59Z
dc.date.available2022-05-05T18:06:59Z
dc.descriptionThe powerhouse was built entirely underground and located about 5.5 miles (8.9km) up the Connecticut River from Turners Falls Dam. A stretch of the Connecticut River, extending some 20 miles (32km) north from this dam to the Vernon Dam, Vermont, serves as the station's lower reservoir. During periods of lower electrical power demand, the plant pumps water from this lower reservoir through the Northfield Mountain Tailrace Tunnel to a man-made upper reservoir. At times of high demand, water is released to flow downhill from this upper reservoir through a turbine generator, where it then collects in the lower reservoir to be stored until again pumped to the upper reservoir. Northfield Mountain's upper reservoir covers 300 acres (120ha) at 800 feet (240m) above the river, with total storage of 5.6billion US gallons (21Gl) of water. Its underground powerhouse lies at 700 feet (210m) below the surface and is accessible through a 2,500-foot (760m)-long tunnel; it includes four large reversible turbines, each of which can pump 15,200 cubic feet (430m3) of water per second and release 20,000 cubic feet (570m3) of water per second to generate 1,143 megawatts (1,533,000hp) of electricity. The turbines can ramp up in 10 minutes and deliver full power for 8 hours. Source: Northfield Mountain (hydroelectricity facility) -Wikipedia
dc.description>>> Archetype imagery is a bit dark. Images here have been digitally enhanced to show detail. <<<
dc.description>>> The date of the item is in the File Name, i.e., 1eg67nfmt.jpg >>> the number in the name (67) is the year of the image . . . 1967.
dc.description.abstractA Gallery of 39 Items
dc.identifier.urihttps://dspace.montaguearchive.org/handle/MHS-01376/6579
dc.language.isoen
dc.titleNorthfield Mt. Hydro-Electric Facility - FirstLight Power Resources
dc.typeImage
dspace.entity.type
dspace.iiif.enabledtrue
Files
Original bundle
Now showing 1 - 5 of 39
Loading...
Thumbnail Image
Name:
1eg67nfmt.jpg
Size:
537.27 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
Surveying the site for the Northfield Mountain Pumped Storage Hydro-Power facility.
Loading...
Thumbnail Image
Name:
2eg67nfmt.jpg
Size:
488.1 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
Site work begins.
Loading...
Thumbnail Image
Name:
3eg67nfmt.jpg
Size:
454.32 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
Site work begins.
Loading...
Thumbnail Image
Name:
4eg67nfmt.jpg
Size:
388.72 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
A sizeable berm is being b uilt.
Loading...
Thumbnail Image
Name:
5eg67nfmt.jpg
Size:
427.81 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
Unknown excavation.
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.68 KB
Format:
Item-specific license agreed upon to submission
Description: