Farren Memorial Hospital Demolition. (Part 6) July 12-17-18-19-21, 2023

dc.contributor.authorEd Gregory photographseng
dc.date.accessioned2023-08-26T16:33:02Z
dc.date.available2023-08-26T16:33:02Z
dc.date.issued2023-08-26
dc.descriptionRemoval of roof insulation and sections of a rubber membrane. Other demolition areas are shown.eng
dc.description.abstractA gallery of 26 photos showing the razing of the Farren Memorial Hospital.eng
dc.identifier.urihttps://dspace.montaguearchive.org/handle/MHS-01376/6884
dc.language.isoen
dc.titleFarren Memorial Hospital Demolition. (Part 6) July 12-17-18-19-21, 2023eng
dc.typeImage
dspace.iiif.enabledtrueeng
Files
Original bundle
Now showing 1 - 5 of 26
Loading...
Thumbnail Image
Name:
1 west side rubble 7.12.23.JPG
Size:
344.55 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
West side rubble, lookin' south. This was the 1958 electrical generator bay and kitchen wing.
Loading...
Thumbnail Image
Name:
2 north yard lookin' southwest 7.12.23.JPG
Size:
873.71 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
The north yard/northwest corner. A portion of the foundation of the physical plant fronts the north exposed Farren Care Center.
Loading...
Thumbnail Image
Name:
3 physical plant north foundation 7.12.23.JPG
Size:
218.47 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
Another look at the physical plant northernmost foundation remains. We look to the west.
Loading...
Thumbnail Image
Name:
4 physical plant foundation 7.17.23.JPG
Size:
1007.82 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
The physical plant foundation interior. Once loaded with with two huge boilers and a maze of pipes and control equipment. During the cold months, a single boiler would burn 3,000 gallons of oil per week. During 2022, oil prices were $3.45 per gallon . . . do the math.
Loading...
Thumbnail Image
Name:
5 1995 12-bed wing demo 7.17.23.JPG
Size:
465.73 KB
Format:
Joint Photographic Experts Group/JPEG File Interchange Format (JFIF)
Description:
A 'cat' 336D excavator begins its demo of the Farren Care Center 1995/13-bed wing.
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: